 |
|
_ |
|
Chalouf. 138 Km. Excavation on dry land to widen the canal
In the areas where the terrain was particularly hard, more traditional
methods were used to widen the canal: debris was extracted by hand,
using picks, and loaded into crates which were carried to the dump
by camels.
|
|
|